FeaturesProject track record
The governance

Recommended against measured, errors included.

After the document, the project goes on: the invoice comes in and is compared with the projection, assumptions are re-evaluated on every environment snapshot, and the track record shows recommended against measured, including where we were wrong.

The problem

Why this exists

How it works today

Traditional consulting delivers the report and disappears; the tool delivers the answer and forgets. Six months later, nobody compares what was promised with what happened, and the projection error never teaches anything.

How it works with EVODA

The track record confronts every promised number with the measured one, month by month. A field without a measurement shows a dash, never a zero, and the cost deviation becomes calibration for the next projection.

How it works

Project track record from the inside

1The confrontation

What was said, what was measured, the deviation.

Cost, latency, ingestion and assumptions in the same table: projected, measured and deviation. The project’s accuracy stays visible, with the bias declared.

"Not measured" exists as a first-class state. It is the difference between honesty and a dashboard that only shows what went well.

2The watching

The environment changes; the track record notices.

The connected agent’s periodic snapshots feed the watch: a new table, a removed index and anomalous growth become warnings, and the agent’s silence does too.

A broken assumption and an open objection show up in the same place, because the track record asks a single question: is the decision still standing?

Under the hood

What the track record confronts

The rules that keep the follow-up from becoming propaganda.

bandCost deviation classified inside or outside the 20% band, month by month
dashA field without a measurement shows a dash; "not measured" never becomes zero
driftA deterministic diff between environment snapshots: relevant change becomes a readable warning
openAn objection that stands and a broken assumption stay visible until someone decides on them

Start with the schema you already have

Paste the structure, get the most serious findings in about two minutes, and decide later whether an engagement is worth opening. No account, no card.