FeaturesMemory and assumptions
The consultant

A new engagement starts knowing what the previous one found.

Facts, decisions and learnings live in the project, not in the conversation. And an assumption here has a shape: it is born with the observable condition that would break it, and EVODA re-evaluates it on every read of the environment.

The problem

Why this exists

How it works today

Last quarter’s decision lives in a document nobody can find, and the assumption that supported it is written nowhere. When the scenario changes, the decision is orphaned without anyone noticing, until the bill says so.

How it works with EVODA

Every engagement leaves facts, decisions and assumptions recorded in the project. The assumption carries the condition that would invalidate it; when it breaks, EVODA points at the decisions that depend on it, and the subject reopens with context instead of starting from zero.

How it works

Memory and assumptions from the inside

1Watched assumptions

What was assumed is written down, and checked.

"Active volume stays below 1 TB" does not go in as a comment: it goes in as an assumption with a threshold. When the environment snapshot arrives it is re-evaluated, and the state is visible: standing, broken or retired.

An assumption that can be checked by a metric is watched automatically, with the last reading and a projection of when the threshold would be crossed.

An assumption without a condition is an opinion with a date. Recording one requires declaring what would make it stop holding.
2Across engagements

The project remembers; the conversation may end.

A new engagement in the same project starts with what the previous ones found: requirements, decisions with their why, assumptions and what came back from follow-ups.

In the track record, assumptions appear next to what was recommended and what was measured, because memory without confrontation with reality becomes folklore.

Under the hood

How the watching works

A watched assumption is declared mechanics, with honest limits.

metricA watchable assumption uses a literal metric from the snapshot (rows per table, monthly growth), with comparator and threshold
projectionThe breach projection refuses to project on a short series or a contrary trend: without a base, a dash
breachA broken assumption points at the affected decisions and becomes a warning, never a field that silently changes color
recordAn assumption with a metric is recorded by the consultant in the conversation, so nothing looks automatic without being so

Start with the schema you already have

Paste the structure, get the most serious findings in about two minutes, and decide later whether an engagement is worth opening. No account, no card.